Skip to main navigation Skip to search Skip to main content

A scheduling algorithm for multi-workshop production based on bom and process route

  • Lihong Qiao
  • , Zhenwei Zhang*
  • , Zhicheng Huang
  • *Corresponding author for this work
  • Beihang University

Research output: Contribution to journalArticlepeer-review

Abstract

For the scheduling problem of complex products in multi-workshop production, this paper studied the BOM (Bill of Materials) structure of complex products and the characteristics of the process route and developed the construction method of a multi-level process network diagram. Based on this, a comprehensive mathematical model for scheduling on multi-workshop production was proposed. An improved particle swarm algorithm (PSO) was proposed to solve the problem. By constructing the network subgraph, the invalid search path of the algorithm was avoided, and the efficiency of the algorithm was improved. In addition, for the scheduling problem with product time constraints, this paper presented a path search rescheduling strategy to ensure that the algorithm could obtain an effective search path. Finally, the model and algorithm were verified through a case study. This paper optimized the parameters of the algorithm by different tests and obtained the optimal range of the parameters. At the same time, through the analysis of the scheduling of complex products in a multi-workshop environment, the effectiveness and practicability of the above methods were verified.

Original languageEnglish
Article number5078
JournalApplied Sciences (Switzerland)
Volume11
Issue number11
DOIs
StatePublished - 1 Jun 2021

Keywords

  • BOM
  • Complex products
  • Multi-workshop production
  • Process network diagram
  • Scheduling algorithm

Fingerprint

Dive into the research topics of 'A scheduling algorithm for multi-workshop production based on bom and process route'. Together they form a unique fingerprint.

Cite this